Directional Drilling

APPLICATION OVERVIEW

Hold the planned path from main bore to branch hole.

Directional gas-drainage branch holes place a different demand on the bit: the cutting structure must respond when deviation begins, remain stable as the path develops, and keep the bore open for the drilling assembly.

01

Initiate direction

A responsive cutting face helps the drilling assembly begin the planned deviation without introducing an abrupt change in cutting behavior.

02

Maintain stability

Balanced engagement supports a steady response while the branch-hole path is built and held through the target interval.

03

Keep the bore clean

Open waterways and continuous flushing help move cuttings away from the face and preserve an unobstructed drilling path.

BRANCH-HOLE PATH

Build direction progressively—then hold the branch.

The bit works as part of the drilling assembly. Its role is to deliver a consistent cutting response while the system initiates deviation, develops the branch trajectory, and continues along the planned drainage interval.

Anonymized directional borehole planning linework.

01 / MAIN BORE Establish stable face engagement.

02 / INITIATE DEVIATION Begin the planned directional change.

03 / BUILD & HOLD Develop and maintain the branch path.

04 / DRAINAGE BRANCH Continue with reliable bore cleaning.

SELECTION GUIDE

Choose by the directional objective, not diameter alone.

Both configurations support directional drilling. The better fit depends on how the assembly must initiate deviation, distribute cutting engagement, respond to torque, and clean the branch hole.

Configuration 01

Multi-Wing Flat-Top

Balanced cutting paths and evenly spaced cutters distribute loads, reduce vibration and maintain hole shape in long-reach branched gas-drainage holes.

  1. 01 Stable multi-wing engagement
  2. 02 Controlled torque response
  3. 03 Reliable bore cleaning

Configuration 02

Flat-Top

Alternating rake angles and differently oriented cutters reduce torque fluctuations, vibration and hole deviation in guided hard-rock drilling.

  1. 01 Compact flat-top crown
  2. 02 Controlled steering response
  3. 03 Continuous bore cleaning

PROJECT INPUTS / Formation behavior · Planned path · Drilling assembly · Connection and flushing

Find the Right Tools
for Your Ground Conditions

Share your application and specifications. Our engineering team will support product selection.

Request a Quote

Contact JINGWEI

WECHAT Jwgroup008

WHATSAPP +1 3158320409

No. 70 Jiushi Road, Baqiao District
Xi’an, Shaanxi, China